OEM replacement evaluation
A structured route from existing part evidence to drawing review, sample validation and controlled quotation.
Evaluation route
Identify the existing part and revision. Capture dimensions and interfaces. Review material and duty. Resolve trademark and compatibility wording. Agree a sample and acceptance plan where needed. Freeze the approved drawing before production.
Relevant product families
Polyurethane fine screen panelsReview fine-aperture polyurethane screen panels for wet or dry mineral classification. Share the material, target cut size, panel dimensions, fixing and operating conditions so HUATAO can assess the right configuration.
Polyurethane dewatering screen panelsSteel-frame polyurethane panels for dewatering enquiries. Slot geometry, fixing and operating duty must be reviewed together.
Tufflex polyurethane-coated wire-rope screensPolyurethane-coated wire-rope screening media for replacement and anti-blinding enquiries where the existing deck and tensioning arrangement are known.
TH48-30-0.25MT fine polyurethane screen panelA 1040 x 700 mm, 0.25 mm-aperture fine polyurethane screen panel documented in a HUATAO field-test record. Fit, fixing, material batch and operating duty must still be confirmed against the buyer's machine and drawing.WS85 polyurethane screen panelA WS85 modular polyurethane screen-panel record. Rail profile, drawing revision, aperture geometry and duty require confirmation.