Start with the complete marking on the installed part. If the code is incomplete, photograph the whole panel and each interface beside a scale.
Record panel length and width with the measurement direction, thickness, aperture and shape, hook or fixing arrangement, seals, machine make and model, mineral, wet or dry duty, feed conditions, quantity and delivery country.
State whether the request is for identification, sample qualification or repeat production. A quotation does not by itself confirm compatibility.
Frequently asked questions
What should a screen-panel RFQ include?
Include the complete part or model marking, drawing revision, panel dimensions, aperture and opening shape, fixing and support details, screen machine or deck, wet or dry duty, feed material, operating objective and estimated quantity. Add labelled photographs or drawings where available.
Is the model number alone enough to confirm a replacement?
No. Treat the model as an identification clue and compare it with a controlled drawing or record. Confirm the suffix and revision, panel geometry, fixing, sealing, support contact and operating duty before approval.
What if some project details are not final?
Mark the enquiry as preliminary, list known values and open items separately, and ask the supplier to state assumptions or required evidence. Do not present unknown dimensions or duties as confirmed.
Polyurethane fine screen panels
Polyurethane dewatering screen panels
Tufflex polyurethane-coated wire-rope screens